Yazd Solar Farm
Solar farms EPC projects are one of our main fields
Submarine Power Cable
One of the best ways to connect islands to mainland
South Pars Gas Field
Power Distribution Networks O&M Projects.
Noravan 400 kv S/S
Armani’s third line substation in Noravan city
Renewable Energies
Combined solar and wind farm
Ahvaz
Ahvaz 4 power plant electrical connection to Gotvand (400 KV T/L)
Asaluyeh 400 kv S/S
Asaluyeh 1000 MW powerplant 400/230/66 kv substation
NGL 1200 T/L
Terminal Tower and the next one.

Projects

Some HOTCO’s Projects:

           Full Implementation of Armenia's Third Line of 400 kV Electrical Transmission Line - Part 4

           Full Implementation of Armenia's Third Line of 400 kV Electrical Transmission Line - Part 5

           Full Implementation of Armenia's Third Line of 400 kV Electrical Transmission Line - Part 6

           Implementation and Construction of 20/220/400 kV Noravan Substation of Armenia's Third Electrical Transmission Line

           Implementation and Construction of 400 kV BOO of Asaluyeh Gas Power Plant Substation (Carried out by HOTCO Subsidiary, HNTC)

           Geotechnical Studies and Full Routing of Gwadar 220 kV Transmission Line in Pakistan

           Implementation and Construction of Kish Gas Power Plant Substation and Switcher (Carried out by HOTCO Subsidiary, HNTC)

           Implementation and Electrical Connection of 400 kV Transmission Line Single-Circuit 3- Bundles Ahvaz 4 Power Plant to Gotvand

           Implementation of 400 kV Transmission Line of Fasa - Assaluyeh

           Implementation of 400 kV Transmission Line in Ahvaz - Masjed Soleyman

           Management Services of Shazand (Arak) - Vardavar 400 kV Single-Circuit Transmission Line

           Implementation and Construction of 10 Distribution Substation in Assaluyeh (Carried out by HOTCO Subsidiary, HNTC)

           Full Implementation of Mehran-Dehloran 230 kV Two-Circuit Transmission Line (EPC)

           Implementation of 230 kV Four-Circuit Transmission Line of Pareh Sar Power Plant

           Implementation of 230 kV Transmission Line Ramin Substation to Ahvaz

           Implementation of 230 & 63 kV Four-Circuit Transmission Line in Rasht-Anzali

           Electrification of 230 kV Two-Circuit Power Transmission Line to NGL 1200 plant

           Implementation of 132 kV Transmission Line of 400 kV Bostano (Asaluyeh) Gas Power Plan Substation (PC)

           Electrification of Isfahan 50 kV Photovoltaic Systems (EPC)

           Ge F6 Turbo Generator Installation and Commissioning Unit 6 of Kish 40 MW Power Plant

           Gas Turbine Overhaul, Test and Commissioning Unit 5 of Kish 40 MW Power Plant

           Full Implementation of 63 kV Lordegan Four-Circuit Transmission Lines (PC)

           Electrification of 63 kV Transmission Line of Tarom Copper Mine (PC)

           Electrification of 63 kV Transmission Line of Iran's Homa-Shanol Gas Field (EPC)

           Electrification of 63 kV Transmission Line of Chehel Koure Copper Mine (PC)

           Full Implementation and Electrification of 63 kV Transmission Line of Neyzar Qom Cement Factory (EPC)

           Full Implementation and Electrification of 63 kV of Ghaed Basir Petrochemical Plant (EPC)

           Full Implementation and Electrification of 63 kV Transmission Line of Peyvand Golestan Cement Factory (PC)

           Electrification of 63 kV Two-Circuit Transmission Line of Shahrekord Cement Factory (PC)

           Full Implementation and Electrification of 66 kV Two-Circuit Transmission Line of Bushehr-Dashtestan Cement Factory (EPC)

           Electrification of 66 kV Two-Circuit Transmission Line of Darab Cement Factory (PC)

           Full Implementation of 63 kV Dubble-Circuits Transmission Line of Chaharmahal & Bakhtiari Steel Factory (EPC)

           Full Implementation and Electrification of Aghar Dalan Gas Refinery (EPC)

           Full Implementation of Connection 33 kV Line Between Phase 1 To Phases 9 and 10 of South Pars Gas Development (EPC)

           Electrification of 230 kV Two-Circuit Power Transmission Line to NGL 1300 plant

           Electrification of 132 kV Transmission Line Phases 9 and 1 O of South Pars Gas Field (EPC)